Concrete
Freezer Floor with Heated Glycol System
Project Scope:
- Saw cut and remove existing concrete slab.
- Excavate until suitable soil is present.
- Place 1st layer of bedding sand.
- Install boiler system and glycol lines.
- Place 2nd layer of bedding sand.
- Place two layers of rigid insulation.
- Place vapor barrier.
- Install rebar.
- Pour concrete slab.
- Install formwork for perimeter curbing.
- Pour concrete curbs.
- Saw cut control joints within the new slab.
- Fill control joints using epoxy joint filler.
- Apply concrete sealer.
Project Timeline:
Completed within a 7-day window, on time and within budget.