Freezer Floor with Heated Glycol System

Project Scope:

  • Saw cut and remove existing concrete slab.
  • Excavate until suitable soil is present.
  • Place 1st layer of bedding sand.
  • Install boiler system and glycol lines.
  • Place 2nd layer of bedding sand.
  • Place two layers of rigid insulation.
  • Place vapor barrier.
  • Install rebar.
  • Pour concrete slab.
  • Install formwork for perimeter curbing.
  • Pour concrete curbs.
  • Saw cut control joints within the new slab.
  • Fill control joints using epoxy joint filler.
  • Apply concrete sealer.

 

Project Timeline:

Completed within a 7-day window, on time and within budget.

PROJECT
DETAILS

LOCATION:
Brampton, ON
SCOPE:
1,200 sq.ft
MARKET SECTOR:
Industrial