Tank Lining

Effluent Tank Coating

Project Scope:

  • Transport effluent tank to shop in order to install coating in a controlled environment.
  • Diamond grind the concrete surface for abrasion.
  • Hand trowel the floor and walls of the tank using polyurethane surfacer.
  • Apply topcoat to the polyurethane using chemical resistant epoxy coating system.

 

Project Timeline:

Completed within a 4-day window, including transportation.

PROJECT
DETAILS

LOCATION:
New Hamburg, ON
SCOPE:
725 sq.ft
MARKET SECTOR:
Commercial